Proposed 600MW hyperscale data centre near Auchtertool and the Mossmorran complex, the first site in ILI Group's planned Stoics network. A planning permission in principle application drew strong local objection and was paused in 2026 after Scottish ministers directed that an EIA is required.
- Operator
- ILI Group
- Location
- Auchtertool, Fife
- Status
- Planned
- Capacity
- 600 MW
- Planning reference
- 26/01243/PPP
- Last checked
- 1 Nov 2026