West Cambridge Data Centre
University of Cambridge research computing data centre hosting systems such as CSD3 and Dawn. A 2025-26 power and cooling upgrade raises Data Hall 1 from about 1.3MW to 1.8MW.
- Operator
- University of Cambridge
- Location
- Cambridge, Cambridgeshire
- Status
- Capacity
- 1.3 MW
- Last checked
- 1 Nov 2026
The pin shows the town, not the exact site.
Sources
Spotted something out of date? Send a correction.